Nunavut landscape
TSX-V: BMV | OTC: BMVVF

BATHURST METALS CORP.

Gold exploration in British Columbia and Nunavut, Canada.

Peerless · 56 km² · BC Turner Lake · 125 km² · Nunavut Active Drill Permits
49.6M
Shares Outstanding
As of May 2026
65.1M
Fully Diluted
Including warrants
~13%
Insider Ownership
Aligned interests
~$250K
Cash
Working capital

Company Snapshot

Key Highlights

01

Peerless — BC · 56 km²

  • RC 87-8: 4.52m @ 29.93 g/t Au
  • RC 87-9: 1.52m @ 35.12 g/t Au
  • Bralorne–Pioneer system: 4.2 Moz @ ~17.7 g/t Au
  • Active drill permit
02

Turner Lake — Nunavut · 125 km²

  • TL-09-26: 18.00m @ 5.60 g/t Au
  • TL-09-28: 2.00m @ 25.56 g/t Au
  • TL-09-29: 13.0m @ 13.21 g/t Au
  • Active drill permit
03

Greenstone Belt Setting

  • Same belt as Agnico Eagle — Hope Bay (~8.8 Moz)
  • Same belt as B2Gold — Back River (~10.1 Moz)
  • District-scale 100% owned land package
  • Limited modern exploration
04

Capital Structure

  • 49,623,694 shares issued & outstanding
  • 12,543,334 warrants outstanding
  • 65,117,028 shares fully diluted
  • ~13% insider ownership

Regional Context

In the Heart of a Major Mining Camp

Bathurst Metals' projects sit alongside multi-million-ounce gold districts — each home to producers and well-financed peers.

01
Gold Bridge Camp · BC
~4.2 Moz

~17.7 g/t Au

Canada's highest-grade historic district. Talisker Resources (~$300M MC): Bralorne 1.7 Moz @ 6.4 g/t. Endurance Gold (~$100M MC): Reliance 1.45 Moz @ 2.3 g/t inferred.

Bathurst: Peerless Project
02
Hope Bay District · Nunavut
~8.8 Moz

Agnico Eagle

3.4 Moz @ 6.53 g/t Au P&P; 2.2 Moz @ 4.61 g/t Au indicated; 3.2 Moz @ 5.98 g/t Au inferred. Same Archean greenstone belt as Turner Lake.

Bathurst: Turner Lake Project
03
Back River District · Nunavut
~10.1 Moz

B2Gold

Goose Mine 300 koz/yr @ 5.97 g/t. 2.4 Moz @ 6.79 g/t Au P&P; 4.2 Moz @ 7.45 g/t Au Indicated; 3.5 Moz @ 8.05 g/t Au inferred.

Bathurst: Turner Lake Project

* Reserve data from Agnico Eagle, B2Gold, Talisker Resources, and Endurance Gold corporate websites (May 2026).

Planned Program

Peerless — Phase 1 Drilling 2026

Phase 1 drilling targets the crosscut of the East–West shear zone and the thrust fault where the 2024 drilling program intercepted visible gold. The program is designed to test the lateral and down-dip extension of the Alpha and Beta Zones.

Alpha · Beta

Zones Targeted

Lateral & down-dip extension

2024

Visible Gold

Intercepted in prior drilling

Active

Drill Permit

Currently in place

2026

Program Year

Phase 1 drilling

The Team

Management & Board

Management combines capital markets and corporate development experience with technical leadership in mineral exploration across British Columbia, the Northwest Territories, and Nunavut.

Full Bios →
EG

Etienne Gouin-Proulx

Interim CEO & Director

CFA, P.Eng. McGill Mining and Mineral Engineering. Project evaluation, M&A, and corporate development.

LW

Lorne Warner, P.Geo.

President & Director

Qualified Person under NI 43-101. Over 30 years of mineral exploration experience.

DM

David McAdam

CFO

Over 30 years of finance and operations experience across public and private mining companies.

Investor Inquiries

Get in touch with the Company